DAILY TESTING SNAPSHOT

WED 12 AUGUST
Day summary: Richard test closed — T adopted as the new DigiStore main control on full-funnel AOV. Compliance page test live against it since this afternoon. Maui design test and all five JVZoo tests running. All figures verified live in CB Split tonight.

DigiStore

SlotTestSales
ctrl · var
CVR
ctrl · var
Status
Main VSLRichard page — W (control) vs T
Closed today: front end near level (4.25% vs 4.01%), T's full-funnel AOV higher ($123.29 vs $122.06) with upsell take rates level or better. T adopted as the new control.
449 · 1814.25% · 4.01%NEW CONTROL
Main VSLCompliance lines added — T (control) vs B
Live since 1:49PM today. Control ahead 5% relative on early numbers, too soon to read. Results to be reviewed with Ben by the weekend.
108 · 453.61% · 3.43%RUNNING
Maui VSLPage design test — B (control) vs E
Control ahead 10% relative on early low numbers, staying at 70/30. Review by the weekend.
67 · 273.95% · 3.59%RUNNING

JVZoo

SlotTestSales ctrl · varCVR ctrl · varStatus
Main VSLExit pop test — Q (control) vs T
Control ahead 12% relative at 123 combined sales, staying at 70/30. Review and call w/c 17 Aug.
89 · 341.66% · 1.48%RUNNING
Upsell 1Popup test — D (control) vs E
Variant ahead 15.7% relative at 209 combined sales, AOV level or better ($172.51 vs $170.74). Meets the current calling thresholds — call planned w/c 17 Aug.
97 · 11216.96% · 19.61%VARIANT LEADING
Upsell 2Monthly Paychecks vs Autopilot — C (control) vs D
Variant ahead 7.8% relative at 129 combined sales, underpowered. Review w/c 17 Aug.
63 · 6625.51% · 27.50%RUNNING
Upsell 3Video pause disable — C (control) vs D
Control ahead 31.9% relative at 136 combined sales; CB Split has declared the control the winner at 95% significance. Call w/c 17 Aug.
77 · 5940.53% · 30.73%CONTROL LEADING
Upsell 4Viral Vid Engine vs Instant Income — C (control) vs D
Level on CVR at 85 combined sales (70/30), too early. Review w/c 17 Aug.
60 · 2524.10% · 24.27%RUNNING

Lock Screen Loophole

SlotStatus
All slotsNew VSL signed off and with Niko for a build timeline. Current VSL not running; existing leads and upsell videos parked for re-use on the new version.

In Build / Moving

• Clocking Out VSL — complete version due Thursday, goes straight into testing on delivery

• $67 Maui affiliate version for Natalie — video done and checked, page build in progress

• JVZoo early-calling process — evidence-based proposal to Ben next week, to speed up JVZoo testing

• Generic order forms — DigiStore on final fixes, JVZoo checkout images being sized; Ben to review the live forms once complete

• Pre-roll tests — scheduled w/c 17 Aug

Full testing plan shared separately · Questions to James